Zephyr ZTA-E36AS Installation Guide Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 21
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
Installation – Mounting the Range Hood
13
1. Select preferred duct location (vertical or
horizontal) if ducting out of kitchen. Refer to
page 10 for details.
2. Install utensil bar to hood. Refer to page 12 for
details.
3. Begin installation by removing the mesh lters.
4. Reinforce cabinet with 1”x2” wood strips
if additional strengthening is required or if
cabinets are framed.
5. Temporarily position the range hood in the
desired mounting location. Measure and
mark the mounting holes, duct and electrical
locations with a pencil.
6. Drill/cut out the required openings for duct and
electrical access; make sure the duct opening
is large enough to apply duct tape.
7. Fasten hood onto cabinet with (4) M4 wood
screws provided.
8. Install electrical.
9. Install duct work and seal with duct tape.
10. Reinstall mesh lters.
11. Power up hood and check for leaks around
duct tape.
12. If recirculating the hood refer to page 11 for
more details.
Hood is designed for installation under a
kitchen cabinet
9. Aluminum du
c
tape
6. Duct
opening/
cutout
4. Add 1”x2”
wood strips
2. Mesh
filters
8. Electrical
Fig 3
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 21

Comments to this Manuals

No comments