Zephyr ZMD-M90AS Installation Guide Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 44
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
11
Installation – Mounting the Hood
7. Remove tape securing electronics mounting bracket to hood. (FIG. F, #1) Position electronics mounting bracket
as show in (FIG. F, #2) and secure to hood body using (3) M4 x 8 truss head sheet metal screws.
8. Lift hood body and align the (4) pre-installed mounting screws on top of blower housing (FIG. A, #5 on Page 9) with
the (4) key holes on the bottom of the support frame. (FIG. H) Slide hood towards the narrow end of key holes to lock
in place. Hand tighten each of the (4) screws to secure hood to bottom of support frame. Install (1) M4 x 12mm safety
screw into bottom support frame to further secure the hood. (FIG. H, #1)
9. Install electrical and duct work. Seal duct work with aluminum duct tape.
10. Power up hood, verify all functions and check for leaks around duct tape.
FIG. F
ELECTRONICS
MOUNTING
BRACKET
1
2
FIG. H
1
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 43 44

Comments to this Manuals

No comments