Zephyr Layers Wall ALA - M90ABX User Manual

Browse online or download User Manual for Fans Zephyr Layers Wall ALA - M90ABX. Zephyr Layers Wall ALA - M90ABX User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 27
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
www.zephyronline.com
Layers Wall
ALA - M90ABX
ALA - M90AWX
ALA - E42ABX
ALA - E42AWX
Edge Wall
AED - M90ASX
Surface Wall
ASU - M90ASX
ASU - E42ASX
Duo Wall
ADU - M90ASX
RANGE HOOD - Installation instructions
Page view 0
1 2 3 4 5 6 ... 26 27

Summary of Contents

Page 1 - Duo Wall

www.zephyronline.comLayers WallALA - M90ABXALA - M90AWXALA - E42ABXALA - E42AWXEdge WallAED - M90ASXSurface WallASU - M90ASXASU - E42ASXDuo WallADU -

Page 2

www.zephyronline.comModel: ADU-M90ASXLight BulbsControlDecorative Mesh FiltersRange Hood BodyLight PanelBlower HousingElectrical Junction BoxDuct Cove

Page 3 - Contents

Ducting Calculation SheetMaximum Duct Length: For satisfactory air movement, the total duct length should not exceed 100 equivalent feet.- 11 -

Page 4 - Safety instructions

www.zephyronline.comfront of hoodside of hoodtop of hoodModels: ALA-M90ABX / ALA-M90AWX / ALA-E42ABX / ALA-E42AWXHood Speci cations- 12 -

Page 5

Models: ASU-M90ASX / ASU-E42ASXfront of hoodside of hoodtop of hoodHood Speci cations- 13 -

Page 6

www.zephyronline.comModels: AED-M90ASX35-3/8"11-1/4"12-1/16"10-1/16"19-11/16"Wood Trim Dimensions5/8" ThicknessHood Spec

Page 7

Models: ADU-M90ASX35-3/8"11-1/4"12-1/16"10-1/16"19-11/16"Wood Trim Dimensions1-5/8" ThicknessHood Speci cationsfront of

Page 8

www.zephyronline.comInstallation - Internal Blower The following instructions are for installing the internal blower.CAUTION: To reduce the risk of 

Page 9

6. Attach the 6 pin male molex connector from blower wire to the 6 pin female molex connector located inside the blower housing. See Fig.6 7. Install

Page 10 - List of Materials

www.zephyronline.com The following instructions are for preparing the hood for use with an ex-ternal or in-line blowers models CBE-1000 or PBN-1000A.

Page 11 - Ducting Calculation Sheet

6. Insert the 6 pin female molex connector into the junction box. See Fig. 6A. Secure remote blower junction box to top of blower housing using (2) sc

Page 12 - Hood Speci cations

www.zephyronline.comHOTTE PER CUISINE - Notice d’utilisation...Pag. 27CAMPANA EXTRACTORA - Manual de utilización...Pag. 53CAPPA ASPIRANTE - istruzioni

Page 13

www.zephyronline.com WARNING FIRE HAZARDNEVER exhaust air or terminate duct work into spaces between walls, crawl spaces, ceiling, attics or garages.

Page 14

Installation - Mounting the Range Hood MOUNTING HEIGHTSThe range hood must be installed at a minimum height of 24 inches (61cm) from the cooking sur

Page 15

www.zephyronline.com GENERAL• Carefully read the following important information regarding installationsafety and maintenance. Keep this information

Page 16

MOUNTING THE DUCT COVERModels: ALA-M90ABX / ALA-M90AWX / ALA-E42ABX / ALA-E42AWX / AED-M90ASX / ADU-M90ASX1. Install the electrical wiring and test

Page 17

www.zephyronline.comModels: ASU-M90ASX and ASU-E42ASX 1. Install the electrical wiring and test hood for functions prior to installing the duct covers

Page 18

Maintencance MAINTENANCE• It is recommended to operate the appliance prior to cooking. It is recommended to leave the appliance in operation for 5 mi

Page 19

www.zephyronline.comList of Parts and AccessoriesDESCRIPTION HOOD PART#REPLACEMENT PARTSLight Bulb GU4, 20W (each) ALA, ASU Z0B0030Light Bulb G4, 20W

Page 21 - Min 24" - Max 36"

ContentsSAFETY INSTRUCTIONS...pag. 4LIST OF MATERIALS..

Page 22

www.zephyronline.com IMPORTANT SAFETY INSTRUCTIONS FOR RESIDENTIAL USE ONLY READ AND SAVE THESE INSTRUCTIONS PLEASE READ ENTIRE INSTRUCTIONS BEFORE PR

Page 23

settings.B. Always turn hood ON when cooking at high heat or when  ambeing foods ( i.e. Crepes Suzette, Cherries Jubilee, Peppercorn Beef Flambè ).C

Page 24

www.zephyronline.comthrough the  ue (chimney) of fuel burning equipment to prevent back drafting. Follow the heating equipment manufacturer’s guideli

Page 25 - Maintencance

Models: ALA-M90ABX / ALA-M90AWX / ALA-E42ABX / ALA-E42AWXDuct CoversElectricalJunction BoxDuct Cover BracketGlassLight BulbsDecorative Mesh FiltersRan

Page 26 - List of Parts and Accessories

www.zephyronline.comModels: ASU-M90ASX / ASU-E42ASXDuct Cover BracketControlDuct CoversBlower HousingRange Hood BodyGlassElectricalJunction BoxLight B

Page 27 - 3LIK0482

Models: AED M90ASXDuct Cover BracketControlDuct CoversLight PanelLight BulbsDecorative Mesh FiltersList of MaterialsRange Hood BodyTYPE DESCRIPTION N°

Comments to this Manuals

No comments